Dig Diary Extra – 3d model of Structure Thirty-Two
A 3d photogrammetry model of Structure Thirty-Two by Trench J supervisor, Paul Durdin.
Thirty-Two is a later construction, built on the rubble of Structure Five’s south-western end.
Friday, July 15, 2022
A 3d photogrammetry model of Structure Thirty-Two by Trench J supervisor, Paul Durdin.
Thirty-Two is a later construction, built on the rubble of Structure Five’s south-western end.